WB's SMALL BOATS annual magazine 2023
Be sure to select PRINT or DIGITAL when you order.
—————————————————————————————
SPECIAL OFFER FROM WOODENBOAT
You can get Small Boats 2023 shipped to you in the US and not pay shipping IF you order a subscription to WoodenBoat, and tick the checkbox on that page to buy the 2023 Small Boats adding $12.95 to the sub offer. Click SUCH A DEAL.
(to Canada add $17.95, and the rest of the world, $25.95 to the price of the sub—delivery included)
—————————————————————————————
Small Boats 2023 is 116 pages, culling the best of Small Boats Magazine, the on-line monthly published since 2014.
Cover: Glen-L's Hunky Dory
LINE UP:
The 66 Canoe. The 66 Canoe, from Brian Schulz of Cape Falcon Kayak, is meant to be built from a video class that guides the builder through a series of custom design decisions. The boat can be paddled or sailed.
Colonia Dinghy. SUN DANCE II is a sprightly 17′ sailing dinghy whose design dates back to 1901. The original boat of the series from which she emerged, designed by N.G. Herreshoff and built by the Herreshoff Manufacturing Company, was a daysailer meant to be carried aboard the 189’ Gardner & Cox–designed steam yacht COLONIA. Plans are from the Herreshoff Marine Museum in Bristol, Rhode Island.
Deblois Street Dory. Clint Chase of Saco, Maine, designed the Deblois Street Dory in the spirit of New England’s working dories. The lapstrake hull, and graceful curve of the bow, the tombstone transom, and low sweep of the sheer are all inspired by the Swampscott dory type. In a later iteration of the design, it was modified to sail, and is available as a kit.
Devon Scaffie. The Scaffie, designed by John Watkinson, founder of the Drascombe line of small boats, has been in production in the U.K. since 1978. This versatile daysailer is 14′9″ long with a beam of 5′9″. At 462 lbs fully rigged, it is ideal for trailering behind even small vehicles. Its 15″ draft allows launching at almost any boat launch.
Excursion Kayak. The 12’8” Excursion from Newfound Woodworks is a good-looking
recreational boat meant for day trips on inland lakes and quiet water.
Handy Billy. In 1998, designer-builder Harry Bryan envisioned an update to the popular deep-V inboard-powered boats William Hand developed from 1900 to 1920. These early, efficient, and seakindly hulls were meant for inboard power; Harry combined them with clean and efficient four-stroke outboards, hidden in a well, to produce a 17- and 21-footer.
Hunky Dory. The rugged powered surf dories of Pacific City, Oregon, were simple to build and rugged enough to withstand launching and hauling from the beach. The Glen-L 22’10” Hunky Dory (and 18’3” Little Hunk) are the only readily available sets of plans with true Pacific City Dory DNA.
Little Crab. The 13′ little crab, an elegant plywood daysailer designed by Doug Hylan. An impressively detailed set of five sheets of plans makes the boat’s construction accessible to the amateur builder.
Outer Banks 26. The Outer Banks 26 is a lobsterboat-inspired cruiser for two people, designed by Graham Byrnes of B&B Yacht Designs. The boat serves her owners as a ferry from their island home in British Columbia, and as a cruiser for multiweek trips.
Ptarmigan 17. This pocket cruiser from Selway Fisher is capacious, capable, and
comfortable—and can be towed home by a car and stored in the garage. The boat can be built stitch-and-glue or glued lapstrake, and there are two rig options: a cat and a yawl.
Sand Dollar. Sand Dollar is an 11′ flat-bottomed skiff designed by Arch Davis that can be rigged to sail, rows well, and looks good. It is built in the glued-lapstrake-plywood method.
Six Hour Canoe. This easily built 15' double-paddle plywood canoe is based on the pirogues of Louisiana. Mike O’Brien designed it in 1977 and built the first one when he had two spare 4 x 8 sheets of plywood in his shop. Thousands have been built since.
Utility Launch 21’. Nelson Zimmer designed this launch with inspiration from the slim
handsome launches that were prevalent after World War I. The boat is designed to transport passengers and supplies between towns and remote fishing camps in Canada’s North Woods, and it also makes an excellent recreational picnic launch.
8-1/8 x 10-7/8", 112 pages
To see more about the on-line publication, click Small Boats Magazine, where you can subscribe and be notified by email when each issue goes live.
————————————————————
“Your downloads are ready” will be the subject line of an email you’ll receive from us—once we’ve processed your digital order. That email has the link to click, so you can then download the file.
This isn't an "instant" process, so if we're asleep, you may need to wait for regular business hours for us to process the order. Although we are quite timely, we may not be processing on weekends & holidays.
Product Information
Product Information
Shipping & Returns
Shipping & Returns



WB's SMALL BOATS annual magazine 2023
WB's SMALL BOATS annual magazine 2023
Be sure to select PRINT or DIGITAL when you order.
—————————————————————————————
SPECIAL OFFER FROM WOODENBOAT
You can get Small Boats 2023 shipped to you in the US and not pay shipping IF you order a subscription to WoodenBoat, and tick the checkbox on that page to buy the 2023 Small Boats adding $12.95 to the sub offer. Click SUCH A DEAL.
(to Canada add $17.95, and the rest of the world, $25.95 to the price of the sub—delivery included)
—————————————————————————————
Small Boats 2023 is 116 pages, culling the best of Small Boats Magazine, the on-line monthly published since 2014.
Cover: Glen-L's Hunky Dory
LINE UP:
The 66 Canoe. The 66 Canoe, from Brian Schulz of Cape Falcon Kayak, is meant to be built from a video class that guides the builder through a series of custom design decisions. The boat can be paddled or sailed.
Colonia Dinghy. SUN DANCE II is a sprightly 17′ sailing dinghy whose design dates back to 1901. The original boat of the series from which she emerged, designed by N.G. Herreshoff and built by the Herreshoff Manufacturing Company, was a daysailer meant to be carried aboard the 189’ Gardner & Cox–designed steam yacht COLONIA. Plans are from the Herreshoff Marine Museum in Bristol, Rhode Island.
Deblois Street Dory. Clint Chase of Saco, Maine, designed the Deblois Street Dory in the spirit of New England’s working dories. The lapstrake hull, and graceful curve of the bow, the tombstone transom, and low sweep of the sheer are all inspired by the Swampscott dory type. In a later iteration of the design, it was modified to sail, and is available as a kit.
Devon Scaffie. The Scaffie, designed by John Watkinson, founder of the Drascombe line of small boats, has been in production in the U.K. since 1978. This versatile daysailer is 14′9″ long with a beam of 5′9″. At 462 lbs fully rigged, it is ideal for trailering behind even small vehicles. Its 15″ draft allows launching at almost any boat launch.
Excursion Kayak. The 12’8” Excursion from Newfound Woodworks is a good-looking
recreational boat meant for day trips on inland lakes and quiet water.
Handy Billy. In 1998, designer-builder Harry Bryan envisioned an update to the popular deep-V inboard-powered boats William Hand developed from 1900 to 1920. These early, efficient, and seakindly hulls were meant for inboard power; Harry combined them with clean and efficient four-stroke outboards, hidden in a well, to produce a 17- and 21-footer.
Hunky Dory. The rugged powered surf dories of Pacific City, Oregon, were simple to build and rugged enough to withstand launching and hauling from the beach. The Glen-L 22’10” Hunky Dory (and 18’3” Little Hunk) are the only readily available sets of plans with true Pacific City Dory DNA.
Little Crab. The 13′ little crab, an elegant plywood daysailer designed by Doug Hylan. An impressively detailed set of five sheets of plans makes the boat’s construction accessible to the amateur builder.
Outer Banks 26. The Outer Banks 26 is a lobsterboat-inspired cruiser for two people, designed by Graham Byrnes of B&B Yacht Designs. The boat serves her owners as a ferry from their island home in British Columbia, and as a cruiser for multiweek trips.
Ptarmigan 17. This pocket cruiser from Selway Fisher is capacious, capable, and
comfortable—and can be towed home by a car and stored in the garage. The boat can be built stitch-and-glue or glued lapstrake, and there are two rig options: a cat and a yawl.
Sand Dollar. Sand Dollar is an 11′ flat-bottomed skiff designed by Arch Davis that can be rigged to sail, rows well, and looks good. It is built in the glued-lapstrake-plywood method.
Six Hour Canoe. This easily built 15' double-paddle plywood canoe is based on the pirogues of Louisiana. Mike O’Brien designed it in 1977 and built the first one when he had two spare 4 x 8 sheets of plywood in his shop. Thousands have been built since.
Utility Launch 21’. Nelson Zimmer designed this launch with inspiration from the slim
handsome launches that were prevalent after World War I. The boat is designed to transport passengers and supplies between towns and remote fishing camps in Canada’s North Woods, and it also makes an excellent recreational picnic launch.
8-1/8 x 10-7/8", 112 pages
To see more about the on-line publication, click Small Boats Magazine, where you can subscribe and be notified by email when each issue goes live.
————————————————————
“Your downloads are ready” will be the subject line of an email you’ll receive from us—once we’ve processed your digital order. That email has the link to click, so you can then download the file.
This isn't an "instant" process, so if we're asleep, you may need to wait for regular business hours for us to process the order. Although we are quite timely, we may not be processing on weekends & holidays.
Original: $6.95
-65%$6.95
$2.43Product Information
Product Information
Shipping & Returns
Shipping & Returns
Description
Be sure to select PRINT or DIGITAL when you order.
—————————————————————————————
SPECIAL OFFER FROM WOODENBOAT
You can get Small Boats 2023 shipped to you in the US and not pay shipping IF you order a subscription to WoodenBoat, and tick the checkbox on that page to buy the 2023 Small Boats adding $12.95 to the sub offer. Click SUCH A DEAL.
(to Canada add $17.95, and the rest of the world, $25.95 to the price of the sub—delivery included)
—————————————————————————————
Small Boats 2023 is 116 pages, culling the best of Small Boats Magazine, the on-line monthly published since 2014.
Cover: Glen-L's Hunky Dory
LINE UP:
The 66 Canoe. The 66 Canoe, from Brian Schulz of Cape Falcon Kayak, is meant to be built from a video class that guides the builder through a series of custom design decisions. The boat can be paddled or sailed.
Colonia Dinghy. SUN DANCE II is a sprightly 17′ sailing dinghy whose design dates back to 1901. The original boat of the series from which she emerged, designed by N.G. Herreshoff and built by the Herreshoff Manufacturing Company, was a daysailer meant to be carried aboard the 189’ Gardner & Cox–designed steam yacht COLONIA. Plans are from the Herreshoff Marine Museum in Bristol, Rhode Island.
Deblois Street Dory. Clint Chase of Saco, Maine, designed the Deblois Street Dory in the spirit of New England’s working dories. The lapstrake hull, and graceful curve of the bow, the tombstone transom, and low sweep of the sheer are all inspired by the Swampscott dory type. In a later iteration of the design, it was modified to sail, and is available as a kit.
Devon Scaffie. The Scaffie, designed by John Watkinson, founder of the Drascombe line of small boats, has been in production in the U.K. since 1978. This versatile daysailer is 14′9″ long with a beam of 5′9″. At 462 lbs fully rigged, it is ideal for trailering behind even small vehicles. Its 15″ draft allows launching at almost any boat launch.
Excursion Kayak. The 12’8” Excursion from Newfound Woodworks is a good-looking
recreational boat meant for day trips on inland lakes and quiet water.
Handy Billy. In 1998, designer-builder Harry Bryan envisioned an update to the popular deep-V inboard-powered boats William Hand developed from 1900 to 1920. These early, efficient, and seakindly hulls were meant for inboard power; Harry combined them with clean and efficient four-stroke outboards, hidden in a well, to produce a 17- and 21-footer.
Hunky Dory. The rugged powered surf dories of Pacific City, Oregon, were simple to build and rugged enough to withstand launching and hauling from the beach. The Glen-L 22’10” Hunky Dory (and 18’3” Little Hunk) are the only readily available sets of plans with true Pacific City Dory DNA.
Little Crab. The 13′ little crab, an elegant plywood daysailer designed by Doug Hylan. An impressively detailed set of five sheets of plans makes the boat’s construction accessible to the amateur builder.
Outer Banks 26. The Outer Banks 26 is a lobsterboat-inspired cruiser for two people, designed by Graham Byrnes of B&B Yacht Designs. The boat serves her owners as a ferry from their island home in British Columbia, and as a cruiser for multiweek trips.
Ptarmigan 17. This pocket cruiser from Selway Fisher is capacious, capable, and
comfortable—and can be towed home by a car and stored in the garage. The boat can be built stitch-and-glue or glued lapstrake, and there are two rig options: a cat and a yawl.
Sand Dollar. Sand Dollar is an 11′ flat-bottomed skiff designed by Arch Davis that can be rigged to sail, rows well, and looks good. It is built in the glued-lapstrake-plywood method.
Six Hour Canoe. This easily built 15' double-paddle plywood canoe is based on the pirogues of Louisiana. Mike O’Brien designed it in 1977 and built the first one when he had two spare 4 x 8 sheets of plywood in his shop. Thousands have been built since.
Utility Launch 21’. Nelson Zimmer designed this launch with inspiration from the slim
handsome launches that were prevalent after World War I. The boat is designed to transport passengers and supplies between towns and remote fishing camps in Canada’s North Woods, and it also makes an excellent recreational picnic launch.
8-1/8 x 10-7/8", 112 pages
To see more about the on-line publication, click Small Boats Magazine, where you can subscribe and be notified by email when each issue goes live.
————————————————————
“Your downloads are ready” will be the subject line of an email you’ll receive from us—once we’ve processed your digital order. That email has the link to click, so you can then download the file.
This isn't an "instant" process, so if we're asleep, you may need to wait for regular business hours for us to process the order. Although we are quite timely, we may not be processing on weekends & holidays.














